What's Going on in Canada?

What's Going on in Canada?

Whats Going on in Canada? Ken Tapping [email protected] 1. New Instruments: CHIME 2. New Instruments: SKA Antenna Prototype 3. The Noise Floor Problem 4. Mobile and Multiple Unlicensed Devices 5. The Smart Meter Problem 6. DRAO Interference/Noise Monitor CHIME (Canadian Hydrogen Intensity Mapping Experiment) 1. Joint project of University of British Columbia, University of Toronto, McGill University and DRAO 2. Objective is to map fine structural scales in highly red-shifted (z=0.8 to 2.5) hydrogen from the early

universe. The instrument is not primarily intended to be an imager, but more a spatial filter and statistical measurement tool. It is also intended to be a pulsar instrument (primary operation 2016-2021). 3. Primary Operating Band 400-800 MHz, divided into 1024 Channels (Channel width 390 KHz). 4. Noise Temperature 50K plus sky temperature. 5. Antennas are multiple parabolic cylinders with linear feeds, phased to be a transit instrument with multiple beams in declination (10,000 m2 collecting area). 6. Observations will require two years of observation.

7. To test feasibility and fully evaluate the DRAO observing environment a pathfinder instrument has been built (700 m2 collecting area). 8. An instrument of that size is applicable to many projects. Its use as a full synthesis instrument will need a faster number cruncher. CHIME-Pathfinder CHIME-Whole Site Synthesis Radio Telescope Next Generation Solar Flux Monitor

Remains of 22 MHz Array Pathfinder Site for CHIME Solar Flux Monitors 26m Radio Telescope Interference Monitor 0.5-40 GHz ELINT Antenna Calibration Noise Source 20dB Directional Coupler

1. 2. 3. 4. 5. A system for monitoring base noise levels in bands of interest and for identifying interfering signals of particular interest. SDR technology makes the system very adaptive. 0.5-18 GHz LNA Can measure integrated power and spectra up to 50-MHz wide anywhere in tuning range. Can skip around monitoring different frequency bands. Can demodulate/decode pretty near anything. Will use for interference identification and also monitoring

background noise level in various bands. Currently the RF amplifier cannot completely use the antennas capabilities and the B200 cannot exploit the full band of the RF amplifier or antenna. However, components will be replaced as possible and as required. The antenna was the expensive component. Ettus B200 SDR Device (10MHz-6GHz) Linux Computer Running gnuradio/simple_ra software Network Interference Monitor SKA Antenna Prototype Smart Electricity Meters

1. 2. 3. 4. 5. 6. The British Columbia electricity utility wants to deploy smart electricity meters. These form a peer-pear network transmitting and relaying data across the network to nodes. They use the 900 MHz band. This is close to the CHIME band and could splatter into it. The third harmonic falls in the pass band of our solar radio flux monitors, which produce the F10.7 data. Industry Canada told the utility they must liaise with us as to where the new system may and may not be deployed. We are doing an interference study to assess the potential threat to DRAO and what sort of deployment would be acceptable (Beyond what range? In what communities?) Electricity Company

Smart Electricity Meters N= No Transmitters per km2 P = Mean Power per Transmitter r Rmin dr RMax RMax NP PTot log e 2 RMin Smart Electricity Meters

Estimated Interference Levels 1. Interference sources start 2km away (the community of St Andrews, and end at 100km on a flat Earth. 2. They individually transmit 1% of the time (randomly distributed). 3. They are distributed 10 per square kilometre. 4. Unwanted emission data provided by the manufacturers 5. Transmitter power +28dBm 6. Bandwidth = 300kHz 7. Modulation envelope with sin2(x)/x2 roll-off. Victim Freq Threshold One Many CHIME

800 MHz -232 dB(W.m-2.Hz-1) -214 dB(W.m-2.Hz-1) -174 dB(W.m-2.Hz-1) CHIME 900 MHz -231 dB(W.m-2.Hz-1) -158 dB(W.m-2.Hz-1) -119 dB(W.m-2.Hz-1) F10.7

2800 MHz -220 dB(W.m-2.Hz-1) -212 dB(W.m-2.Hz-1) -200 dB(W.m-2.Hz-1) Were still in the process of making assessments for the other bands used at DRAO. To do this we need more test data, because current information not good enough for extrapolating that far. Need to do 408MHz and 1420MHz. Other Things 1. Canada has still to find/coerce/persuade/force a new person to take on the mantle of radio astronomy spectrum manager. 2. In the interim I am still stuck to the Tar Baby for the important stuff, and formally involved with local DRAO issues. 3. The background noise level produced by multiple sources is a major interest in Canada. Industry Canada has a monitoring system running at DRAO. We are

implementing a system of our own as well. Its not clear how we can address this issue or whether it is solvable at all. 4. We are working more intensely with the local offices of Industry Canada and also nationally on studies of water and electricity meter networks and similar systems. 5. Leap secondsenough said. This issue is now being spearheaded by the national time standard people at NRC. 6. How do we manage facilities like CHIME, which have to use bands not allocated to radio astronomy? Are local spectrum management agreements workable?

Recently Viewed Presentations

  • Diapositiva 1 - COEV

    Diapositiva 1 - COEV

    Para los europeos la libertad y la seguridad tienen connotaciones bien diferentes. La libertad no se encuentra en la autonomía, sino en la inserción. Ser libre es tener acceso a muchas relaciones interdependientes. Cuantas más sean las comunidades a las...
  • Welcome to Data-Driven Decision Making Presenter: Gene Woodard

    Welcome to Data-Driven Decision Making Presenter: Gene Woodard

    were being used fewer hours than expected- this data helps meet targets for machine use for each piece of equipment/site. Talking points: Managers are provided their site's machine usage on a regular basis . Having this data prompted the department...
  • Antibiotics fo

    Antibiotics fo

    Medication to be stored in the fridge once it is made up. ... Entered onto online database - preferred . Or printed, signed as a true copy, & faxed to 023 8000 2380. Remember to also document it in the...
  • Background Radiation Patterns - northallegheny.org

    Background Radiation Patterns - northallegheny.org

    Background. Radiation is made up of certain particles that are so highly energized that they transfer energy through ionization. All the matter around this radioactive particle either loses or gains electrons creating fast moving particles and waves.
  • Agriscience Defined - Agriculture in the Classroom

    Agriscience Defined - Agriculture in the Classroom

    Application of scientific principles and new technologies Applied science Uses basic sciences in practical ways Biology Chemistry Physics Agriscience Examples Agronomy Uses biology and chemistry to produce and control crops Cotton Soybeans Tobacco Corn Hay and Turf grass Agriscience Examples...
  • Ecologica l, Planning, Theory Robin Rothfeder PhD Student,

    Ecologica l, Planning, Theory Robin Rothfeder PhD Student,

    Traditional: Enlightenment-era framework based on order, predictability, and 'rationality' "Has permeated and reconstructed human consciousness so totally that today we scarcely question its validity… (setting) guidelines for decision-making in technology, industry, and government" (Merchant, 2005, pp. 47-48). Worldviews. Ethics ...
  • Fundamental concepts

    Fundamental concepts

    Topics for discussion. Read chapter 4 of the text book. The architectural model of a Dapp. Using the Truffle IDE for developing Dapps. Connecting the front end to the smart contract
  • INL Background - University of Idaho

    INL Background - University of Idaho

    Virginia L. Wright. University of Idaho. Computer Science Colloquia. October 9, 2017. INL Background. One in a network of 17 DOE national labs. DOE's lead lab for nuclear energy. A major center for National Security. Research in the National Interest...