PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE

PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE

PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS POWER SECTOR - BACKGROUND WAPDA was formed in 1958. The major responsibilities of WAPDA were; Meet electricity demand of the country (except area of Karachi) by installing new power plants, transmission lines and distribution system. Develop hydro storage project ( dams) for meeting irrigation and demand of the country and install hydro plants at dams locations. 2 POWER POWER SECTOR SECTOR-- BACKGROUND BACKGROUND WAPDA Had Two Wings; 1. Power wing Responsible for power matters

2. Water wing Responsible for water matters The WAPDA AUTHORITY consisted of; Chairman Member Power- Head of Power wing Member Water Head of Water wing Member Finance Head of Financial matters 3 POWER SECTOR - BACKGROUND SECTIONS OF POWER WING WAPDA 1. 2. 3. 4. Hydro Generation plants Thermal Generation plants Transmission lines and grid stations Distribution network for consumers 4

POWER SECTOR - BACKGROUND 1. The GoP approved Pakistan Power Sector Strategic Plan for restructuring and reform in 1992. 2. PEPCO was established in 1998 as an independent entity with mandate to split Power wing of WAPDA into various entities and then corporatize & commercialize the restructured entities. 3. PEPCO initiated the restructuring and reform process in 1998. The reform process was considerably slowed down beyond 2001 when PEPCO was reduced to a Division in WAPDA. 4. The GoP reactivated the mandate of PEPCO in October 2007 to bridge the increasing demand supply gap and to reduce the resulting load shedding in the country 5. By the end of 2011, everybody was fed up with PEPCO, and now the restructured entities are being managed by the Ministry of Water & Power directly. 5 PEPCO SYSTEM 1. 2. 3. 4.

Hydro Generation (Remains with WAPDA) Thermal Generation 4 GENCOs Transmission 1 NTDC Distribution 10 DISCOs 6 Consumers vs Consumption Pattern No. of Consumers Consumption Consumers (As on 30th Jun 2013) (Jul 2012 - Jun 2013) Category Nos. % age Billion % age units

Domestic Commercial Industrial Agricultural Others Total 18,713,537 85.55% 2,550,808 11.66% 296,849 1.36% 301,115 1.38% 13,291 0.06% 21,875,600 100.00% 33.258 51.18 4.657 7.17 19.172 29.5 7.548 11.61 0.351 0.54 64.986 100.00%

7 Consumption Pattern Jul-2012 - Jun 2013 Agricultural; 11.61% Others; 0.54% Domestic; 51.18% Industrial; 29.50% Commercial; 7.17% 8 GENERATION SOURCES June 2013 1. HYDRO WAPDA IPPS Sub Total 6733

195 6928 2. THERMAL EX. WAPDA GENCOs 4785 IPPs 8359 NUCLEAR 650 Sub-Total 13794 GRAND TOTAL 20,722 9 Generation Sources (MW) June 2013

6733; 32.49% 650; 3.14% 8359; 40.34% 4785; 23.09% 195; 0.94% 10 EXISTING GENERATING CAPABILITY (June, 2013) Availability (MW) Type of Generation Nameplate/

Dependable Installed Capacity Capacity (MW) (MW) Summer Winter Hydro 6928 6928 6928 2300* GENCOs

4785 3536 2736 3178** IPPs (incl Nuclear) 9009 8300 7000 7578** Total 20722

18764 16664 13056 * Hydro availability based on last 5 years average ** Excludes 10% Forced Outages for GENCOs & 6.0% for IPPs 11 VARIATION IN GENERATION MIX YEAR HYDEL GENERATION THERMAL GENERATION

1994- 95 50 % 50 % (Mostly on gas) 2000- 01 30 % 70 % 2006- 07 36 % 64 % 2012- 13 34 %

66 % ( Mostly on oil) 12 Reasons For Price Hike Of Cost Of Electricity Oil Prices are beyond control of Pakistan Depletion of natural gas reserves Non-conducive circumstances for foreign investments (national/regional instability) Delay in exploitation of indigenous resources, i.e. Thar Coal in South and huge hydel potential in Northen Areas Theft of Electricity 13 PEPCO SYSTEM HISTORICAL SURPLUS / DEFICIT Years Available Capability

Computed Peak Demand Surplus/ Shortfall 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 10894 10958 11834

12792 12600 13292 12442 13637 13445 13193 12320 13577 10459 11044 11598 12595 13847 15838 17398 17852 18467 18521 18940 18827

435 -86 236 197 -1247 -2546 -4956 -4215 -5022 -5328 -6620 -5250 24/12/2010 Advance Caution Of Load Shedding/Short Fall By Planning Power WAPDA/NTDC In The Year 2000 25000 Capability (MW)

20000 Capabili ty 15000 10000 5000 0 2004-05 2005-06 2006-07 2007-08 2008-09

2009-10 Years 15 Country wide Load Forecast of XWAPDA DISCOs & KESC (MW) Year 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 Note XWAPDA DISCOs

19400 20401 21556 22761 24018 25352 26810 28353 30036 31757 KESC 3021 3240 3484 3762 4157 4592 5067 5587 6144 6752

Country 22199 23407 24792 26261 27896 29647 31562 33604 35822 38127 Diversity Factor 1.01 is applied to get country demand NTDC demand is PMS based prepared in March 2012 KESC demand is Regression Based prepared in January 2011 16 Existing Transmission Network of NTDC

500/220 kV Transformers (14,850 MVA) 220/132 kV Transformers (18,044 MVA) 500 kV Lines (5,078 km) 220 kV Lines (7,947 km) 18 Long Term Transmission Expansion Plan The proposed transmission expansion plan upto 2030 will be able to transmit about 90,000 MW power. 19 Comprehensiveness OF Transmission

Expansion Plan The Transmission Expansion Plan has been proposed to successfully and safely evacuate power from the mega hydel projects in the Northern areas and Thar Coal Power projects in the Southern part of the country. 20 Finances Required Huge Investment to the tune of about 280 Billion USD are required by 2030 for reliable Generation and Transmission Expansion to meet the Forecasted Electric Power 21 Situation after June, 2013 The present government has some aggressive plans to install coal fired plants at Gadani

Power Park and Bin Qasim Karachi to bridge the gap in supply and demand by the year 2017. The success in implementation of the plans, however depends on how much conducive environment is created for foreign investment. 22

Recently Viewed Presentations

  • Donation Drop Off Centers - Long Island Cares, Inc.

    Donation Drop Off Centers - Long Island Cares, Inc.

    Donation Drop Off Centers Warehouse - 10 Davids Drive Hauppauge NY 11788 ... Long Island Cares DOES NOT accept clothing or furniture. ... www.suffolkfcu.org for branch locations Brian Gill Agency 713 Walt Whitman Rd Melville, New York 11747 United States...
  • A Cairo loge meets in the 1940s under

    A Cairo loge meets in the 1940s under

    Thoth was called "The Lord of the Divine Books" and "Scribe of the Company of the Gods." Helios: From Troy Temple Relief, 3000 BC Athena Lady Liberty Isis Sol Invictus (Roman sun god) Thor's hammer 32nd Degree Freemason Buddhist Swastika...
  • Analysing a political cartoon - While I'm Away...

    Analysing a political cartoon - While I'm Away...

    Glen Waverley Secondary College Other titles: Arial Calibri Bodoni MT Black Adobe Garamond Pro Bold Trajan Pro Kozuka Gothic Pro EL Default Design Analysing a political cartoon On the surface political cartoon may be humorous; but they communicate a thought-provoking,...
  • 1 MIKE MAZZALONGO Whats So Good About The

    1 MIKE MAZZALONGO Whats So Good About The

    "Though I am not what I ought to be, nor what I wish to be, nor what I hope to be; I can truly say that I am not what I once was, a slave to sin & Satan and...
  • EKONOMICZNA ANALIZA PRAWA - Uniwersytet Warszawski

    EKONOMICZNA ANALIZA PRAWA - Uniwersytet Warszawski

    Od ekonomii do prawa „(…) ekonomiści mogą się nauczyć od prawników pewnych metod (…) Wynik spraw prowadzonych przez prawników zależy często od dokładnego ustalenia faktów w sporze (co samo w sobie jest umiejętnością godną podziwu) i nadania tym faktom określonych...
  • Gas & Electricity Energy Industry Stats 500 billion

    Gas & Electricity Energy Industry Stats 500 billion

    Warren Buffet Former Chairman of G.E Jack Welch Described energy deregulation as "The next biggest thing since the internet" Elon Musk, Co-Founder of PayPal & Founder of Tesla Cars is spending billions in the Energy Space LARGEST CONSUMER FOOTPRINT of...
  • Types of Poetry

    Types of Poetry

    Poetry - Advanced Topics Mr. Whitehead
  • Informal Resources and Constraints Freewrite What formal resources

    Informal Resources and Constraints Freewrite What formal resources

    Informal resources & constraints Skills: Persuasion Hidden hand leadership Personality Ambition Changes in the dominant political rhetoric Richard Neustadt The constitutional presidency is a clerkship Presidential power is the power to persuade The power to persuade is the power to...